|
|
|
|
|
| |
- Time and Motion Studies: Performed to determine labor costs and for further improvement
- Predetermined Time Standards (MOST, MODAPTS, MTM): Evaluate the work content using standard times
- Line/ Resource/ Manpower Balancing: Balance the work content between operators and equipment
- Station Optimization: Reengineering activity to improve efficiency
- Process and Methods Improvement: Change the process of an operation to improve efficiency
- Job Scheduling: Schedule work based on process to meet delivery time
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|